POSITION: CONSTRUCTION ENGINEERING CONSULTANT
EDUCATION Iowa State Univ, Bachelor of Science Hawkeye Institute of Tech, Waterloo, IA
Construction Engineering, 1986 AAS, Civil Engineering Tech, 1982
MEMBER Assoc. of State Dam Safety Officials (ASDSO), United States Society on Dams (USSD).
CHIEF DAM SAFETY COORDINATOR (CDSC) for the High Hazard Humphreys Dam in Colorado.
EXPERIENCE
Gary was president and owner of Moltz Constructors, Inc. of Cody, WY, from 1989 till 2014, when he sold the company to its employees. For 25 years Gary managed diverse types of heavy civil projects, including the rehabilitation of dams, spillways & tunnels; water/wastewater treatment plants, fish hatcheries, and pipelines. He managed multiple large gate rehabilitation projects for the U.S. Bureau of Reclamation, including slide gates, ring follower gates, radial gates, and floating drum-style gates. Many of these projects were in remote locations with limited access through canyons, rivers, and rugged terrain. Heavy civil projects in the Rocky Mountains required mitigating the additional challenges of unpredictable weather patterns and working at elevations up to 10,000 ft. (See Moltz Constructors’ corporate resume 1989-2014 for a complete list and descriptions of these projects.)
Gary started Keo Civil LLC in 2014 to provide consulting services for design firms, government agencies, irrigation districts, and private landowners as they plan projects related to the construction or repair of dams, spillways, gates, valves, and hydroelectric projects. Gary especially enjoys early brainstorming of project concepts for projects with tough access and other unusual conditions. His constructability reviews, problem-solving, and cost-saving ideas have made many projects more successful and safer.
Extensive Government contracting experience, including the United States Bureau of Reclamation, the US Army Corps of Engineers, the US Fish & Wildlife Service, the US Post Office, and many State and Local Agencies. FAR Experienced.
KEO CIVIL LLC OWNER / CONSULTANT 2014-Current
Somerset Dam Improvement Project, Queensland, Australia 2022 - 2027
Client: Seqwater Contact: Rob Campbell, Brisbane Rob.Campbell@seqwater.com.au
Prepare and plan for a proposed upgrade to Somerset Dam that will raise the Dam crest, construct a downstream buttress, modify the gated spillway, and replace eight 8x12 sluice gates. Work is expected to take 5-7 yrs & cost +2B$.
Oroville Dam, DWR, State of California 2020 –2027
An invited member of an independent consulting board to review the design and ongoing installation by DWR and Stantec Engineering for the installation of the replacement of the lower outlet at Oroville Dam. There are two new 72” spherical valves with a capacity of roughly 3,000 to 4,000 cfs. The valves are under 600 ft. of head and located in a tunnel beneath the dam.
Greenland Three, Renewable Energy Project Development, U.S. State Department / Deloitte 2022-2023
The team from Greenland One & Two (see below) was once again invited back to continue their hydro work. The pre-feasibility study concentrated on the areas in SW Greenland near Narsarsuaq.
Bougainville Power & Light Feasibility Study, Autonomous Region of Bougainville (Soloman Islands) 2022
Client: Numa Numa Resources Contact: Lindsay George at Small Hydro Consulting, LLC lindsay@smallhydro.usGary visited the island to collect information for the team regarding land availability, site conditions, topographical details, access issues, hydrological data, and general powerplant layout suggestions.
Greenland Two, Renewable Energy Project Development, U.S. State Department / Deloitte 2022
The team from Greenland One (see below) was invited back to continue their hydro work. The pre-feasibility study concentrated on the areas surrounding Kangerlussuaq (Sondestrom Air Force Base).
Gorge Dam Removal & Restoration. Cuyahoga Falls, OH 2021
Contact: Paul Perri, AECOM, Denver, CO paul.perri@aecom.com (303) 378-0613
Offering alternative ideas and constructability considerations in the decommissioning & removal of this dam.
St. Francis Dam Gate Replacement, Valier, MT 2021-2022
Contact: Cole Peebles, Pondera County Canal & Reservoir Company, pccrc@3rivers.net, (406) 279-3315
Advise on gate options & procurement, project schedules, monthly progress calls, and oversight of gate installation.
Taylor Park Hydro-Electric Plant, Gunnison County Electric, CO 2021-2023
Contact: Clifton Oertli, NEI Electric Power Engineering Inc., Lakewood, CO, coertli@neieng.com (303) 431-7895
Technical Advisor for a new 500 kW hydro plant located at the USBR’s Taylor Park Reservoir at 9000’. This is the largest known Single-Phase hydro plant in the world.
Juncal Dam Outlet Modifications, Santa Barbara, CA 2021
Contact: Michael Wong, GEI Consulting, Rancho Cordova, CA mwong@geiconsultants.com, (916) 631-4592Draft construction concepts, prepare CPM schedule, review specs & drawings at 10%, 30%, and 90/100% milestones.
Matilija Dam Removal 65% Design Planning Project, CA 2021
Contact: Brian Person, AECOM, Oakland, CA brian.person@aecom.com (530) 526-4441
Provide constructability reviews of AECOM’s Draft 30% and 65% design packages. Offer alternative conceptual ideas.
Burdekin Falls Dam, Queensland, Australia 2020
Contact: Sunwater Ltd., Rob Campbell
Constructability reviews to install post-tensioned, 91-strand vertical anchors on a 1650 ft. wide Ogee crest spillway to address stability concerns. Possible crest raising & abutment buttressing. Spill capacity: 2.3 million cfs (64,600 m3/sec).
DeHart Dam Improvements, Dauphin County, PA 2019-2023
Contact: Scott Jones, AECOM, 625 W. Ridge Pike, Conshohocken, PA 19428 (610) 832-3500
Summary of Work: Constructability review & estimate for demo & replacement of 110’ x 1,500’ chute spillway.
Cobble Mountain Reservoir, Granville, MA 2019-2021
Contact: Scott Jones, AECOM, 625 W. Ridge Pike, Conshohocken, PA 19428 (610) 832-3500
Summary of Work: Constructability review for the outlet works improvements and the hydroelectric power plant bypass.
Greenland One, Renewable Energy Project Development, U.S. State Department / Deloitte 2020-2021
Nukissiorfiit is Greenland’s national utility company. They currently use diesel generators to provide electrical power to most of Greenland’s remote villages. They plan to develop renewable energy solutions and request technical assistance via the U.S. Department of State and the Bureau of Energy Resources. Gary served as the Senior Hydropower Engineer on a 3-member team sent to two small settlements, one in South Greenland, the other in very remote East Greenland. They investigated potential sites for Hydropower and have drafted pre-feasibility reports.
Edenville Dam Stabilization, Local Agency Flood Response, and Support, MDOT of Michigan,, 2020
Contact: Sal Todoro, AECOM, Denver CO, Salvatore.todaro@aecom.com (303) 694-2770
Edenville Dam failed in Spring 2020. AECOM was contracted to stabilize the remaining structure before Spring 2021. Gary provided constructability reviews and scheduling assistance.
,
Paradise Dam, Queensland Australia $100 million project 2019-2020
Contact: Sunwater Ltd., Rob Campbell, Chief of Dams
Constructability planning for the removal of 5 meters from the 1,000 ft. wide RCC ogee crest of the Paradise Dam Spillway. Member of a design-build team working with General Contractor: CPB Contractors of Fortitude Valley, QLD.
Mosul Dam Outlet Works Repair & Jezira Tunnel Rehabilitation, Mosul, Iraq 2016- 2019
Contact: AECOM, Ted Montoya, 8181 East Tufts Ave, Denver, CO 80237 (303) 694-2770
Summary of Work: Consultation regarding rehabilitating a 20’wide x 30’tall high-pressure slide gate, new spillway dentate structures, outlet works tunnel leaking expansion joint, review of misc. Mechanical systems.
Edgar M Hoopes Dam Repairs. Wilmington, DE 2018
Contact: Scott Jones, AECOM, 625 W. Ridge Pike, Conshohocken, PA 19428 (610) 832-3500
Summary of Work: Constructability review for demolition & replacement of concrete dam crest.
USBR Shoshone Powerplant Roof Replacement, Cody, WY 2017
Contact: Megan Crow, MC2 Engineering & Construction PC, Sheridan, WY (307) 673-7350
Summary of Work: Designed unique methods to replace the roof of a rock-fall-rated hydropower plant on a historic structure with access challenges. Provided constructability, estimating, and scheduling services.
Stagecoach Dam, Steamboat Springs, CO 2017
Member of a team to assess the existing condition of the dam and hydropower facilities. Made recommendations for 30-year costs and maintenance programs. Assisted in the design of a new 125’ deep sluice gate stem guide system utilizing full enclosure with SS pipe to repair failing stem guide support brackets.
Swift Dam High-Pressure Gate Repair, Valier, MT 2015
Owner: Pondera County Canal & Reservoir Company, 501 Pondera Ave., Valier, MT 59486 (406) 279-3315
Kajaki Dam – Irrigation Works, Afghanistan 2014
Contact: U.S. Army Corps of Engineers, Sal Todaro, Denver, CO
Summary of Work: Design advice regarding gland leakage on a 16-inch gate valve under 300’ of head.
Cheesman Dam Phase 2 2010
Contact: URS Corporation & Denver Water, Jeff Martin, P.E., Denver, CO 80204 (303) 628-6508
Summary of Work: Constructability Review and Engineer’s Estimate
Humphreys Dam Hydroelectric Project 2011 Private
Summary of Work: Construction of a 312 KW Hydroelectric plant. Work included the installation of a siphon intake into Humphreys Reservoir, 700 lf of 36” welded steel penstock, dewatering & in-river cofferdam, concrete powerplant foundation & tailrace, and installation of crossflow turbine and generator, vacuum system controls, siphon fill system & controls.
Keo Civil has performed construction work on dams, irrigation structures, and hydropower facilities. Projects have included:
Tongue River Dam Cavitation Damage Repair, 2016
Owner: Montana Dept. of Natural Resources, PO Box 201601, Helena, MT 59620-1601 (406) 444-2074
Eureka Dam Outlet Works Gate Rehabilitation, 2015
Owner: Teton Co-Operative Canal Company, 1903 W. 8th LN, NW Choteau, MT 59422 (406) 466-2300
Swift Dam High-Pressure Gate Repair, 2015
Owner: Pondera County Canal & Reservoir Company, 501 Pondera Ave., Valier, MT 59486 (406) 279-3315
Gibson Dam Bulkhead Replacement, 2014
Owner: Greenfields Irrigation District, 105 W. Central Ave., Box 157, Fairfield, MT 59426 (406) 467-2020
MOLTZ CONSTRUCTORS, INC. - CODY, WY 1989-2014
Owner, President, Project Manager & Estimator
See Moltz Constructors’ corporate resume 1989 – 2014 for a complete list and descriptions of these projects. These included 51 projects for the U.S. Bureau of Reclamation.
Midcon of New Mexico, Albuquerque, NM Superintendent & Field Engineer 1987 - 1989
Hunzinger Construction Company, Milwaukee, Wisconsin Office Engineer………………………………..1986
Roche Constructors, Inc., Aspen, Colorado, Field Engineer Summer 1985
Iowa Dept. of Transportation AND Northern Border Pipeline Company--- Field Surveyor 1980-1984